{"id":9993,"date":"2025-11-17T15:09:51","date_gmt":"2025-11-17T09:39:51","guid":{"rendered":"https:\/\/tradesmartonline.in\/blog\/?p=9993"},"modified":"2025-11-28T11:30:06","modified_gmt":"2025-11-28T11:30:06","slug":"fujiyama-power-systems-ipo-allotment-status","status":"publish","type":"post","link":"https:\/\/designingprojectmanagement.com\/blog\/fujiyama-power-systems-ipo-allotment-status\/","title":{"rendered":"Fujiyama Power Systems IPO Allotment Status, Price Band, &#038; GMP"},"content":{"rendered":"<h2 data-start=\"494\" data-end=\"568\"><span style=\"font-size: 14pt;\"><strong>Fujiyama Power Systems IPO Allotment Status: Everything You Need to Know<\/strong><\/span><\/h2>\n<p data-start=\"570\" data-end=\"1196\">The Fujiyama Power systems IPO allotment status is closely awaited by investors after the company launched its \u20b9828 crore public issue. With a price band of <strong data-start=\"723\" data-end=\"746\">\u20b9216\u2013\u20b9228 per share<\/strong>, many applicants are now keen to check whether they\u2019ve been allotted shares. You can check your Fujiyama Power IPO allotment status via the <a href=\"https:\/\/in.mpms.mufg.com\/Initial_Offer\/public-issues.html\">registrar<\/a>, <a class=\"decorated-link\" href=\"https:\/\/www.bseindia.com\/investors\/appli_check.aspx\" target=\"_new\" rel=\"noopener\" data-start=\"902\" data-end=\"960\">BSE<\/a>, or <a class=\"decorated-link cursor-pointer\" href=\"https:\/\/www.nseindia.com\/invest\/check-trades-bids-verify-ipo-bids\" target=\"_new\" rel=\"noopener\" data-start=\"965\" data-end=\"1031\">NSE<\/a> once the basis of allotment is declared. Tracking the Fujiyama Power IPO allotment status helps you keep an eye on refunds, demat credits, and the listing date.<\/p>\n<hr data-start=\"1198\" data-end=\"1201\" \/>\n<table class=\"w-fit min-w-(--thread-content-width)\" style=\"font-size: 16px;\" data-start=\"1222\" data-end=\"2062\">\n<thead data-start=\"1222\" data-end=\"1239\">\n<tr data-start=\"1222\" data-end=\"1239\">\n<th style=\"text-align: center;\" data-start=\"1222\" data-end=\"1229\" data-col-size=\"sm\"><strong>Item<\/strong><\/th>\n<th style=\"text-align: center;\" data-start=\"1229\" data-end=\"1239\" data-col-size=\"sm\"><strong>Detail<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"1250\" data-end=\"2062\">\n<tr data-start=\"1250\" data-end=\"1291\">\n<td data-start=\"1250\" data-end=\"1261\" data-col-size=\"sm\">IPO Name<\/td>\n<td data-start=\"1261\" data-end=\"1291\" data-col-size=\"sm\">Fujiyama Power Systems Ltd<\/td>\n<\/tr>\n<tr data-start=\"1292\" data-end=\"1358\">\n<td data-start=\"1292\" data-end=\"1305\" data-col-size=\"sm\">Issue Size<\/td>\n<td data-start=\"1305\" data-end=\"1358\" data-col-size=\"sm\">\u20b9 828 crore<\/td>\n<\/tr>\n<tr data-start=\"1359\" data-end=\"1437\">\n<td data-start=\"1359\" data-end=\"1372\" data-col-size=\"sm\">Price Band<\/td>\n<td data-start=\"1372\" data-end=\"1437\" data-col-size=\"sm\">\u20b9 216 &#8211; \u20b9 228 per share<\/td>\n<\/tr>\n<tr data-start=\"1438\" data-end=\"1500\">\n<td data-start=\"1438\" data-end=\"1449\" data-col-size=\"sm\">Lot Size<\/td>\n<td data-start=\"1449\" data-end=\"1500\" data-col-size=\"sm\">65 shares<\/td>\n<\/tr>\n<tr data-start=\"1501\" data-end=\"1591\">\n<td data-start=\"1501\" data-end=\"1529\" data-col-size=\"sm\">Minimum Retail Investment<\/td>\n<td data-start=\"1529\" data-end=\"1591\" data-col-size=\"sm\">\u20b9 14,820 (65 \u00d7 \u20b9228)<\/td>\n<\/tr>\n<tr data-start=\"1592\" data-end=\"1659\">\n<td data-start=\"1592\" data-end=\"1606\" data-col-size=\"sm\">Fresh Issue<\/td>\n<td data-start=\"1606\" data-end=\"1659\" data-col-size=\"sm\">\u20b9 600 crore<\/td>\n<\/tr>\n<tr data-start=\"1660\" data-end=\"1736\">\n<td data-start=\"1660\" data-end=\"1683\" data-col-size=\"sm\">Offer for Sale (OFS)<\/td>\n<td data-start=\"1683\" data-end=\"1736\" data-col-size=\"sm\">\u20b9 228 crore<\/td>\n<\/tr>\n<tr data-start=\"1737\" data-end=\"1807\">\n<td data-start=\"1737\" data-end=\"1749\" data-col-size=\"sm\">IPO Opens<\/td>\n<td data-start=\"1749\" data-end=\"1807\" data-col-size=\"sm\">13 November 2025<\/td>\n<\/tr>\n<tr data-start=\"1808\" data-end=\"1879\">\n<td data-start=\"1808\" data-end=\"1821\" data-col-size=\"sm\">IPO Closes<\/td>\n<td data-start=\"1821\" data-end=\"1879\" data-col-size=\"sm\">17 November 2025<\/td>\n<\/tr>\n<tr data-start=\"1880\" data-end=\"1965\">\n<td data-start=\"1880\" data-end=\"1907\" data-col-size=\"sm\">Tentative Allotment Date<\/td>\n<td data-start=\"1907\" data-end=\"1965\" data-col-size=\"sm\">18 November 2025<\/td>\n<\/tr>\n<tr data-start=\"1966\" data-end=\"2062\">\n<td data-start=\"1966\" data-end=\"1991\" data-col-size=\"sm\">Tentative Listing Date<\/td>\n<td data-start=\"1991\" data-end=\"2062\" data-col-size=\"sm\">20 November 2025 on BSE &amp; NSE<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr data-start=\"2064\" data-end=\"2067\" \/>\n<h3 data-start=\"2069\" data-end=\"2105\"><span style=\"font-size: 14pt;\"><strong>IPO Overview &amp; Company Insight<\/strong><\/span><\/h3>\n<p data-start=\"2107\" data-end=\"2408\">Fujiyama Power Systems (also known as UTL Solar \/ Fujiyama Solar) is a leading manufacturer in India\u2019s rooftop solar ecosystem. Its product portfolio includes solar panels, inverters (on-grid, off-grid, hybrid), and batteries (both lead-acid and lithium-ion).<\/p>\n<p data-start=\"2410\" data-end=\"2754\">The IPO comprises a <strong data-start=\"2430\" data-end=\"2445\">fresh issue<\/strong> of \u20b9600 crore and an <strong data-start=\"2467\" data-end=\"2491\">Offer for Sale (OFS)<\/strong> of \u20b9228 crore by existing shareholders. The fresh capital will help fund a new manufacturing facility in Ratlam, Madhya Pradesh, repay debt, and support general corporate purposes.<\/p>\n<hr data-start=\"2756\" data-end=\"2759\" \/>\n<h2 data-start=\"2761\" data-end=\"2801\"><strong><span style=\"font-size: 14pt;\">How To Check the Allotment Status of Fujiyama Power via the Registrar, BSE, and NSE?<\/span><\/strong><\/h2>\n<p data-start=\"2803\" data-end=\"2915\">Here are detailed steps to check your Fujiyama Power IPO allotment status via the Registrar, BSE, and NSE:<\/p>\n<p data-start=\"2917\" data-end=\"2966\"><strong>Via Registrar (MUFG Intime India Pvt. Ltd.)<\/strong><\/p>\n<ol data-start=\"2967\" data-end=\"3232\">\n<li data-start=\"2967\" data-end=\"3020\">\n<p data-start=\"2970\" data-end=\"3020\">Go to the <a href=\"https:\/\/in.mpms.mufg.com\/Initial_Offer\/public-issues.html\">Registrar\u2019s IPO Allotment Status page<\/a>.<\/p>\n<\/li>\n<li data-start=\"3021\" data-end=\"3090\">\n<p data-start=\"3024\" data-end=\"3090\">Select <strong data-start=\"3031\" data-end=\"3061\">Fujiyama Power Systems Ltd<\/strong> from the company dropdown.<\/p>\n<\/li>\n<li data-start=\"3091\" data-end=\"3165\">\n<p data-start=\"3094\" data-end=\"3165\">Enter your <strong data-start=\"3105\" data-end=\"3112\">PAN<\/strong>, <strong data-start=\"3114\" data-end=\"3136\">Application Number<\/strong>, or <strong data-start=\"3141\" data-end=\"3162\">Demat \/ Client ID<\/strong>.<\/p>\n<\/li>\n<li data-start=\"3166\" data-end=\"3232\">\n<p data-start=\"3169\" data-end=\"3232\">Click <strong data-start=\"3175\" data-end=\"3194\">Submit \/ Search<\/strong> \u2192 you will see your allotment result.<\/p>\n<\/li>\n<\/ol>\n<p data-start=\"3234\" data-end=\"3271\"><strong>Via BSE (Bombay Stock Exchange)<\/strong><\/p>\n<ol data-start=\"3272\" data-end=\"3586\">\n<li data-start=\"3272\" data-end=\"3368\">\n<p data-start=\"3275\" data-end=\"3368\">Visit the <a class=\"decorated-link\" href=\"https:\/\/www.bseindia.com\/investors\/appli_check.aspx\" target=\"_new\" rel=\"noopener\" data-start=\"3285\" data-end=\"3365\">BSE Allotment Status Page<\/a>.<\/p>\n<\/li>\n<li data-start=\"3369\" data-end=\"3409\">\n<p data-start=\"3372\" data-end=\"3409\">Choose <em data-start=\"3379\" data-end=\"3387\">Equity<\/em> under &#8220;Issue Type.&#8221;<\/p>\n<\/li>\n<li data-start=\"3410\" data-end=\"3453\">\n<p data-start=\"3413\" data-end=\"3453\">Select <strong data-start=\"3420\" data-end=\"3450\">Fujiyama Power Systems Ltd<\/strong>.<\/p>\n<\/li>\n<li data-start=\"3454\" data-end=\"3504\">\n<p data-start=\"3457\" data-end=\"3504\">Enter your <strong data-start=\"3468\" data-end=\"3475\">PAN<\/strong> or <strong data-start=\"3479\" data-end=\"3501\">Application Number<\/strong>.<\/p>\n<\/li>\n<li data-start=\"3505\" data-end=\"3586\">\n<p data-start=\"3508\" data-end=\"3586\">Complete any captcha or verification, then click <strong data-start=\"3557\" data-end=\"3567\">Search<\/strong> \u2192 check allotment.<\/p>\n<\/li>\n<\/ol>\n<p data-start=\"3588\" data-end=\"3627\"><strong>Via NSE (National Stock Exchange)<\/strong><\/p>\n<ol data-start=\"3628\" data-end=\"3894\">\n<li data-start=\"3628\" data-end=\"3732\">\n<p data-start=\"3631\" data-end=\"3732\">Visit the<a href=\"https:\/\/www.nseindia.com\/invest\/check-trades-bids-verify-ipo-bids\"> NSE Allotment Status Page<\/a>.<\/p>\n<\/li>\n<li data-start=\"3733\" data-end=\"3776\">\n<p data-start=\"3736\" data-end=\"3776\">Choose <strong data-start=\"3743\" data-end=\"3773\">Fujiyama Power Systems Ltd<\/strong>.<\/p>\n<\/li>\n<li data-start=\"3777\" data-end=\"3829\">\n<p data-start=\"3780\" data-end=\"3829\">Enter <strong data-start=\"3786\" data-end=\"3826\">PAN \/ Application Number \/ Client ID<\/strong>.<\/p>\n<\/li>\n<li data-start=\"3830\" data-end=\"3894\">\n<p data-start=\"3833\" data-end=\"3894\">Submit \u2192 once allotment is released, your status will appear.<\/p>\n<\/li>\n<\/ol>\n<hr data-start=\"3896\" data-end=\"3899\" \/>\n<h2 data-start=\"3901\" data-end=\"3932\"><span style=\"font-size: 14pt;\"><strong>Fujiyama Power Grey Market Premium (GMP)<\/strong><\/span><\/h2>\n<p data-start=\"3934\" data-end=\"4245\">The Fujiyama Power IPO grey market premium (GMP) has been reported as <strong data-start=\"4008\" data-end=\"4021\">flat (0%)<\/strong>, suggesting little speculative premium over the upper band at the time of launch. \u00a0This could mean conservative listing expectations, or weak speculative demand as of the opening days.<\/p>\n<hr data-start=\"4247\" data-end=\"4250\" \/>\n<h4 data-start=\"4252\" data-end=\"4305\"><span style=\"font-size: 14pt;\"><strong>Pricing Details &amp; Lot Size \u2013 Fujiyama Power IPO<\/strong><\/span><\/h4>\n<p data-start=\"4307\" data-end=\"4587\">The pricing band is <strong data-start=\"4327\" data-end=\"4352\">\u20b9216 \u2013 \u20b9228 per share<\/strong>, with a <strong data-start=\"4361\" data-end=\"4386\">lot size of 65 shares<\/strong>. A retail investor needs to invest a minimum of <strong data-start=\"4435\" data-end=\"4446\">\u20b914,820<\/strong> at the upper price band to apply for one lot. Applications must be made in multiples of 65 shares.<\/p>\n<div class=\"_tableContainer_1rjym_1\">\n<div class=\"group _tableWrapper_1rjym_13 flex w-fit flex-col-reverse\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"4589\" data-end=\"4848\">\n<thead data-start=\"4589\" data-end=\"4610\">\n<tr data-start=\"4589\" data-end=\"4610\">\n<th style=\"text-align: center;\" data-start=\"4589\" data-end=\"4601\" data-col-size=\"sm\"><strong>Parameter<\/strong><\/th>\n<th style=\"text-align: center;\" data-start=\"4601\" data-end=\"4610\" data-col-size=\"sm\"><strong>Value<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"4621\" data-end=\"4848\">\n<tr data-start=\"4621\" data-end=\"4659\">\n<td data-start=\"4621\" data-end=\"4634\" data-col-size=\"sm\">Price Band<\/td>\n<td data-start=\"4634\" data-end=\"4659\" data-col-size=\"sm\">\u20b9 216 \u2013 \u20b9 228 \/ share<\/td>\n<\/tr>\n<tr data-start=\"4660\" data-end=\"4730\">\n<td data-start=\"4660\" data-end=\"4673\" data-col-size=\"sm\">Face Value<\/td>\n<td data-start=\"4673\" data-end=\"4730\" data-col-size=\"sm\">\u20b9 1 per share<\/td>\n<\/tr>\n<tr data-start=\"4731\" data-end=\"4755\">\n<td data-start=\"4731\" data-end=\"4742\" data-col-size=\"sm\">Lot Size<\/td>\n<td data-start=\"4742\" data-end=\"4755\" data-col-size=\"sm\">65 shares<\/td>\n<\/tr>\n<tr data-start=\"4756\" data-end=\"4796\">\n<td data-start=\"4756\" data-end=\"4784\" data-col-size=\"sm\">Minimum Retail Investment<\/td>\n<td data-start=\"4784\" data-end=\"4796\" data-col-size=\"sm\">\u20b9 14,820<\/td>\n<\/tr>\n<tr data-start=\"4797\" data-end=\"4826\">\n<td data-start=\"4797\" data-end=\"4811\" data-col-size=\"sm\">Fresh Issue<\/td>\n<td data-start=\"4811\" data-end=\"4826\" data-col-size=\"sm\">\u20b9 600 crore<\/td>\n<\/tr>\n<tr data-start=\"4827\" data-end=\"4848\">\n<td data-start=\"4827\" data-end=\"4833\" data-col-size=\"sm\">OFS<\/td>\n<td data-start=\"4833\" data-end=\"4848\" data-col-size=\"sm\">\u20b9 228 crore<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<hr data-start=\"4850\" data-end=\"4853\" \/>\n<h4 data-start=\"4855\" data-end=\"4906\"><span style=\"font-size: 14pt;\"><strong>IPO Timeline at a Glance \u2013 Fujiyama Power IPO<\/strong><\/span><\/h4>\n<div class=\"_tableContainer_1rjym_1\">\n<div class=\"group _tableWrapper_1rjym_13 flex w-fit flex-col-reverse\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"4908\" data-end=\"5366\">\n<thead data-start=\"4908\" data-end=\"4924\">\n<tr data-start=\"4908\" data-end=\"4924\">\n<th style=\"text-align: center;\" data-start=\"4908\" data-end=\"4916\" data-col-size=\"sm\"><strong>Event<\/strong><\/th>\n<th style=\"text-align: center;\" data-start=\"4916\" data-end=\"4924\" data-col-size=\"md\"><strong>Date<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"4935\" data-end=\"5366\">\n<tr data-start=\"4935\" data-end=\"5007\">\n<td data-start=\"4935\" data-end=\"4947\" data-col-size=\"sm\">IPO Opens<\/td>\n<td data-start=\"4947\" data-end=\"5007\" data-col-size=\"md\">13 November 2025<\/td>\n<\/tr>\n<tr data-start=\"5008\" data-end=\"5081\">\n<td data-start=\"5008\" data-end=\"5021\" data-col-size=\"sm\">IPO Closes<\/td>\n<td data-start=\"5021\" data-end=\"5081\" data-col-size=\"md\">17 November 2025<\/td>\n<\/tr>\n<tr data-start=\"5082\" data-end=\"5163\">\n<td data-start=\"5082\" data-end=\"5103\" data-col-size=\"sm\">Basis of Allotment<\/td>\n<td data-start=\"5103\" data-end=\"5163\" data-col-size=\"md\">18 November 2025<\/td>\n<\/tr>\n<tr data-start=\"5164\" data-end=\"5265\">\n<td data-start=\"5164\" data-end=\"5189\" data-col-size=\"sm\">Refunds \/ Demat Credit<\/td>\n<td data-start=\"5189\" data-end=\"5265\" data-col-size=\"md\">~19 November 2025 (based on RHP)<\/td>\n<\/tr>\n<tr data-start=\"5266\" data-end=\"5366\">\n<td data-start=\"5266\" data-end=\"5293\" data-col-size=\"sm\">Listing Date (Tentative)<\/td>\n<td data-start=\"5293\" data-end=\"5366\" data-col-size=\"md\">20 November 2025 on BSE &amp; NSE<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<hr data-start=\"5368\" data-end=\"5371\" \/>\n<h4 data-start=\"5373\" data-end=\"5389\"><span style=\"font-size: 14pt;\"><strong>Conclusion<\/strong><\/span><\/h4>\n<p data-start=\"5391\" data-end=\"5816\">The Fujiyama Power IPO allotment status will be a crucial step for all investors, especially given the muted GMP and its capital-intensive expansion plans. The company\u2019s strong footprint in the rooftop solar market, combined with plans for manufacturing growth, makes the IPO interesting. However, since early subscription appears sluggish, investors should check allotment promptly and weigh listing prospects carefully.<\/p>\n<hr data-start=\"5818\" data-end=\"5821\" \/>\n<h4 data-start=\"5823\" data-end=\"5876\"><span style=\"font-size: 14pt;\"><strong>Frequently Asked Questions \u2013 Fujiyama Power IPO<\/strong><\/span><\/h4>\n<p data-start=\"5878\" data-end=\"6030\"><strong data-start=\"5878\" data-end=\"5930\">Q1: When will the allotment status be available?<\/strong><br data-start=\"5930\" data-end=\"5933\" \/>Basis of allotment is expected on <strong data-start=\"5967\" data-end=\"5987\">18 November 2025<\/strong>.<\/p>\n<p data-start=\"6032\" data-end=\"6259\"><strong data-start=\"6032\" data-end=\"6071\">Q2: Where can I check my allotment?<\/strong><br data-start=\"6071\" data-end=\"6074\" \/>Through the Registrar (<a href=\"https:\/\/in.mpms.mufg.com\/Initial_Offer\/public-issues.html\">MUFG Intime<\/a>), or on the <a class=\"decorated-link\" href=\"https:\/\/www.bseindia.com\/investors\/appli_check.aspx\" target=\"_new\" rel=\"noopener\" data-start=\"6121\" data-end=\"6179\">BSE<\/a> \/ <a class=\"decorated-link cursor-pointer\" href=\"https:\/\/www.nseindia.com\/invest\/check-trades-bids-verify-ipo-bids\" target=\"_new\" rel=\"noopener\" data-start=\"6182\" data-end=\"6248\">NSE<\/a> portals.<\/p>\n<p data-start=\"6261\" data-end=\"6393\"><strong data-start=\"6261\" data-end=\"6313\">Q3: What is the lot size and minimum investment?<\/strong><br data-start=\"6313\" data-end=\"6316\" \/>Lot size: <strong data-start=\"6326\" data-end=\"6339\">65 shares<\/strong>. Minimum investment: <strong data-start=\"6361\" data-end=\"6372\">\u20b914,820<\/strong> at the upper band.<\/p>\n<p data-start=\"6395\" data-end=\"6534\"><strong data-start=\"6395\" data-end=\"6422\">Q4: How big is the IPO?<\/strong><br data-start=\"6422\" data-end=\"6425\" \/>\u20b9 828 crore, including \u20b9 600 crore fresh issue and \u20b9 228 crore OFS.<\/p>\n<p data-start=\"6536\" data-end=\"6648\"><strong data-start=\"6536\" data-end=\"6567\">Q5: When will the IPO list?<\/strong><br data-start=\"6567\" data-end=\"6570\" \/>Tentatively on <strong data-start=\"6585\" data-end=\"6605\">20 November 2025<\/strong>.<\/p>\n<p data-start=\"6650\" data-end=\"6811\"><strong data-start=\"6650\" data-end=\"6701\">Q6: What is the grey market premium (GMP) like?<\/strong><br data-start=\"6701\" data-end=\"6704\" \/>Reported to be <strong data-start=\"6719\" data-end=\"6732\">flat (0%)<\/strong>, indicating low speculative premium.<\/p>\n<p data-start=\"6813\" data-end=\"7002\"><strong data-start=\"6813\" data-end=\"6865\">Q7: What will the fresh issue funds be used for?<\/strong><br data-start=\"6865\" data-end=\"6868\" \/>To build a new manufacturing facility in Ratlam, repay debt, and general corporate purposes.<\/p>\n<p data-start=\"7004\" data-end=\"7131\"><strong data-start=\"7004\" data-end=\"7050\">Q8: What happens if I don\u2019t get allotment?<\/strong><br data-start=\"7050\" data-end=\"7053\" \/>You will get a refund of your application money; no shares will be credited.<\/p>\n<hr data-start=\"7133\" data-end=\"7136\" \/>\n<h5 data-start=\"7138\" data-end=\"7455\"><span style=\"font-size: 14pt;\"><strong>\u26a0\ufe0f Disclaimer: <\/strong><\/span><\/h5>\n<p data-start=\"7138\" data-end=\"7455\">The information provided about <em data-start=\"7188\" data-end=\"7216\">Fujiyama Power Systems IPO<\/em> \u2014 including allotment status, GMP, price band, and timelines \u2014 is for informational purposes only. Verify all details via official IPO documents, the registrar, and stock exchange portals (BSE \/ NSE) before making any investment decision.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fujiyama Power Systems IPO Allotment Status: Everything You Need to Know The Fujiyama Power systems IPO allotment status is closely awaited by investors after the company launched its \u20b9828 crore&#8230;<\/p>\n","protected":false},"author":1,"featured_media":10035,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[401],"tags":[1539],"class_list":["post-9993","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","tag-fujiyama-power-systems-ipo-allotment-status"],"_links":{"self":[{"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/posts\/9993"}],"collection":[{"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/comments?post=9993"}],"version-history":[{"count":0,"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/posts\/9993\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/media\/10035"}],"wp:attachment":[{"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/media?parent=9993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/categories?post=9993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/designingprojectmanagement.com\/blog\/wp-json\/wp\/v2\/tags?post=9993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}